Bathrooms and en-suites
Walls at full or half height, floors, boxing-in, window reveals and recessed niches. Behind a bath we tile down to the floor rather than stopping at the panel line, so a new panel later never reveals bare wall.

Bathrooms, showers, wet-room floors, kitchen splashbacks and floors, tiled on walls and floors that have been properly prepared first. Run by James Reilly from Middleton-on-Sea, a few minutes from Bognor Regis.
Swanbourne Tiling tiles walls and floors in homes across Bognor Regis and the villages around it. Bathrooms and en-suites, shower enclosures, wet-room floors, kitchen splashbacks, and floors in kitchens, hallways and extensions, in porcelain, natural stone and large-format tiles.
We are the dedicated tiling side of Swanbourne Construction Ltd, a family-run builder at Middleton Business Park in Middleton-on-Sea. James Reilly has been building in West Sussex since 2008 and has completed over 100 projects. He comes out, looks at your walls and floor, and prices the job himself.
Most tiling failures are not really about the tiles. A cracked grout line is usually a floor that moves. A loose tile in a shower is usually water that got behind it. So your quotation covers the preparation as well as the tiling, written down line by line, with anything we cannot see until the old tiles are off stated plainly.
Walls and floors, inside the house. You can choose and buy your own tiles or we can supply them: the quotation says which.
Walls at full or half height, floors, boxing-in, window reveals and recessed niches. Behind a bath we tile down to the floor rather than stopping at the panel line, so a new panel later never reveals bare wall.
Walk-in showers and showers over a bath. Every wall the water can reach goes onto backer board and a tanking membrane before a tile is fixed, with the internal corners taped.
A level-access floor that falls to the drain from every direction, tanked as one system with the walls and finished in a slip-rated tile. The R rating that tells you how slip-resistant a tile is gets printed on the box.
Metro, brick-bond, patterned or large-format tiles, set out from the worktop so the cut tiles sit where you will not notice them. Fitting a new kitchen first? Swanbourne Kitchens plans and fits the whole room.
Floors run through doorways and across open-plan rooms, including over underfloor heating. On the 50m² rear extension we finished on Victoria Road in Bognor Regis in October 2026, the whole ground floor was tiled over underfloor heating.
Large-format porcelain needs a flatter wall or floor and takes longer to cut and handle. Natural stone needs sealing and the right cleaner afterwards. Mosaic borders are slow work. All of that is priced in, not discovered later.
This is the part of a tiling job you never see once it is finished, and the part that decides whether it lasts.
Old wall tiles often bring the plaster away with them. Making good is a stated item on the quotation. If a wall turns out to need re-plastering or boarding, you see the revised figure before the work is done.
Wet walls are boarded with tile backer board, then tanked: primer, a waterproof membrane and taped internal corners, carried down into the floor where the shower is level with it. A shower rarely leaks at the tap. It leaks through the wall behind the tile, months later, and by then it is a joist problem rather than a grout problem.
The tanking system varies with the room and what it is built off. Schlüter is one we use. Whichever goes on is a proprietary system with a manufacturer's guarantee behind it, and that paperwork comes to you at the end. What we will not do is skim a wet wall with a tub of waterproofer and call it tanked.
Plenty of homes around Bognor Regis are bungalows and 1930s semis, and many of them have suspended timber floors with some give in them. Tiles and grout cannot flex with a floor that moves, so timber floors are overboarded rigid enough not to crack a grout line. Concrete floors are checked with a long straight edge and brought level with levelling compound, or a new screed where the floor is too far out.
Before the first tile goes on, the room is set out so the cut tiles land at the edges and in the corners, not in the middle of the wall you look at. Borders and pattern bands are run level all the way round. Walls are tiled first, then the floor.
We do not publish a rate per square metre for tiling, because the preparation can be as much work as the tiling itself and it changes from room to room. These are the things that move the price, roughly in order.
Only having a room tiled? We tile on its own. If you want the whole bathroom replaced, including the plumbing and the suite, Swanbourne Bathrooms runs complete refits.
We will never compromise on quality but we will match any like-for-like price.
Bring another written quotation to the site visit and we will go through it against ours line by line. Either we match it, or you find out what the cheaper figure leaves out. Ask us for the full terms.
All workmanship is guaranteed for 24 months from completion. Manufacturer warranties on materials and installed products, including the tanking system, are passed to you in full, and many run to 10 years or more. We carry £2m public liability insurance plus employers' liability.
Plain answers. We confirm what applies to your room at the site visit.
Occasionally, on a dry wall where the old tiles are flat and firmly stuck. In a shower, or anywhere that gets wet, we take them off. There is no way to tank over old tiles, and no way to know what is going on behind them until they are off.
Yes. You can choose and buy your own, or we can supply them. The quotation says which. If you are buying, make sure everything is delivered before we start, and check every box carries the same batch or shade number, because two batches of the same tile can be a slightly different colour.
As a rule of thumb, about 10% more than the measured area for a straight layout, and more for a diagonal or herringbone pattern, which creates more cuts. We give you the figure for your room after measuring, and it is worth keeping a few spare after the job in case one ever needs replacing.
Any wall a shower can reach, yes, including the wall over a bath with a shower above it. So does the whole floor of a wet room. Tiles and grout are a finish, not a barrier: if water gets past them, the tanking is what keeps it out of the wall and the floor below. A kitchen splashback or a hallway floor does not need tanking.
Only on a floor that is flat and rigid. The bigger the tile, the less it forgives a dip or a hump, and any movement in the floor shows up as a cracked tile or grout line. Timber floors are usually overboarded first, and concrete floors are checked with a long straight edge and levelled where they need it.
Yes. Tiles are one of the best finishes over underfloor heating because they let the heat through. The heating goes in first, the floor is prepared over it, and the adhesive and grout are chosen to cope with the floor warming up and cooling down.
Not if it is built properly, and a disaster if it is not. The floor has to fall to the drain from every direction and be tanked as one system with the walls. Where the joists are shallow, a low-profile tray with a level threshold gets most of the look with far less risk.
Yes, down to the floor rather than stopping at the panel line, so a future change of panel does not reveal bare wall.
Water along this stretch of coast is hard, so limescale and soap build up on grout quickly. In a shower, it is worth asking about an epoxy grout. It costs more and takes longer to apply, but it does not soak up water and is far easier to keep clean. Elsewhere a good cement-based grout is fine.
Not for tiling on its own. Forming a new bathroom or moving the drainage usually does need an application, and in Bognor Regis that goes to Arun District Council. If your job crosses that line, we tell you at the site visit.
Our own jobs and our own photographs: large-format and patterned wall tiles, borders, niches, a splashback and tiled floors.









James Reilly has been building in West Sussex since 2008. In 2025 he formed Swanbourne Construction Ltd to put that work under one accountable, fully insured limited company, company number 16870716. The office and showroom is Unit 27 at Middleton Business Park, on Yapton Road in Middleton-on-Sea, and you are welcome to visit by appointment.
Tiling has always been part of the bathrooms, kitchens and extensions we build. Swanbourne Tiling makes it a service in its own right, so you can have a room tiled without taking on a building project, and still get the same preparation, the same written quotation and the same guarantee.
We are based in Middleton-on-Sea and keep our tiling work close to home. Most of it is in Bognor Regis itself, and we also cover the villages and neighbourhoods around it:
Not sure whether you are in reach? Ring and ask.
Tell us a little about the room. James will ring you back, normally within one working day, to arrange a time. No charge and no obligation.
Message on WhatsApp: photographs of the walls and floor help.
swanbourneconstruction@gmail.com
Office and showroom
Unit 27, Middleton Business Park, Yapton Road, Middleton-on-Sea, Bognor Regis, West Sussex PO22 6HS
Visits by appointment.
Opening hours
Monday to Friday 7am – 10pm
Saturday 8am – 9pm
Sunday 9am – 6pm
Phones answered 24/7 by a member of our team, never a voicemail.